Best Choice Products Wicker Egg Chair, Oversized Indoor Outdoor Lounger by BestChoiceProducts

Best Choice Products Wicker Egg Chair, Oversized Indoor Outdoor Lounger

$569.23
Sale price  $569.23 Regular price 
Skip to product information
Best Choice Products Wicker Egg Chair, Oversized Indoor Outdoor Lounger by BestChoiceProducts

Best Choice Products Wicker Egg Chair, Oversized Indoor Outdoor Lounger

$569.23
Sale price  $569.23 Regular price 
Shipping calculated at checkout.

Product Overview

The Best Choice Products Wicker Egg Chair is a Lounge Chairs product. It features a distinct, open-weave pattern adds a bohemian touch and complements.

Key Features

  • A distinct, open-weave pattern adds a bohemian touch and complements the decor of your living room, bedroom, or sunroom
  • Water- and UV-resistant wicker with weather-resistant cushions make this seat a natural addition to your patio, garden, poolside, and more
  • Enjoy this seat for years thanks to durable, water-resistant wicker, tightly woven over a powder-coated steel frame
  • Four removable cushions are packed with extra thick padding while the offset, four-legged design with adjustable foot pads supports weights up to 440 pounds!
  • An extra-wide opening gives ample overhead expanse for taller people, while a large seat lets you curl up in comfort with your favorite books or media devices; OVERALL DIMENSIONS: 24"(L) x 40"(W) x 56"(H); WEIGHT CAPACITY: 440lbs.

Why Choose the Best Choice Products Wicker Egg Chair

The Best Choice Products Wicker Egg Chair offers a distinct, open-weave pattern adds a bohemian touch and water- and uv-resistant wicker with weather-resistant cushions make. These features make the Best Choice Products Wicker Egg Chair a strong option in the Lounge Chairs category.

Best For

The Best Choice Products Wicker Egg Chair is best suited for everyday lounge chairs needs.

Quick Summary

The Best Choice Products Wicker Egg Chair is a Lounge Chairs product by BestChoiceProducts. Brand: Best Choice Products. Color: Gray/White Sand. Material: Alloy Steel, Wicker. Product Dimensions: 24"D x 40"W x 56"H. Size: Set of 1. Price: $494.98.

Product Specifications

Specification Details
Brand Best Choice Products
Color Gray/White Sand
Material Alloy Steel, Wicker
Product Dimensions 24"D x 40"W x 56"H
Size Set of 1

CARE & MAINTENANCE

To maintain the beauty and integrity of your purchase, we recommend treating it with care. Simple maintenance practices, such as gentle washing and proper storage, can effectively preserve the longevity of your favorites. We encourage you to refer to the care instructions included with each item, designed to help you keep your purchase in top condition.

SHIPPING & RETURNS

We strive to process and ship all orders in a timely manner, working diligently to ensure that your items are on their way to you as soon as possible. Need to return something? Just let us know.

You may also like